Condition:New | Type:thawing machine |
Application:thawing | Automatic Grade:Automatic |
Production Capacity:98% | Place of Origin:Shandong, China |
Voltage:220~440v | Power(W):40kw |
Dimension(L*W*H):11400 x 1050 x 1500 mm | Weight:3.5ton |
Certification:ce ,iso9000 | Warranty:1 year |
After-sales Service Provided:Engineers available to service machinery overseas |
Thawing machine working principle
This type of thawed machine is a new type of thawing equipment that our company introduction of advanced foreign technology had researched and developed. With the advanced concept, mature design technology efficient utility, energy saving and other characteristics, our machines got the many meat and seafood processing clients favor.
Using the theory of steam heating, preinstalling different product’s thawing parameters, carrying out the temperature, humidity and thawing time etc. parameters by computer control automatically the whole working area was in a different low temperature and high humidity environment turn to airflow from each air exit, rising temperature uniformly and circularly., thawing the frozen product in a reasonable manner, maintaining cell tissue water and keeping the original nutrition; meantime, this thawing machine can be used as refreshment cold room to achieve the goal of food preservation when ending the thawing.
Technical Parameter of microwave thawing machine:
Product Name |
Microwave dryer |
|
Device type |
Transmission belt |
|
Microwave frequency |
2450±50MHz |
|
Power |
00KW |
|
Size |
8.4m*1.1m*1.7m |
|
Transmission speed |
0-5m/minute |
|
Input voltage |
Three-PhaseAC 380V |
|
Weight |
1300kgs |
|
Cabinet color |
Silverh white |
|
The whole material |
Industrial grade stainless steel |
|
Microwave leakage limit |
≤1mW/cm² |
|
Working Time |
24hours |
Our Services
Pre-sale service
1.Supply relative market information and inquiry freely
2.Customization is supplied
3.Equipment device solution
After-sale service
1.One year warranty time except the easy-damaged parts.
2.The lifelong maintenance,only charge material fee.
3.Home installation and commissioning about 7-10 working days, Supplying installation training if you install it by yourself.
4.Retraining the operator by making normative commissioning procedure for equipment ,enable it parameterization and standardization to up to the production conditions reasonable
Copyright © 2017 - 2023Shandong Sino Machinery Equipment Co., Ltd. All Rights Reserved